We work together asacol without a prescription Though delicate and painstaking, retrieving the fuel rod assemblies from the pools is not the toughest job the workers face. More challenging by far will be digging out the molten cores in the reactors themselves. Some of the fuel burned through its primary containment and is now mixed with cladding, steel and concrete. The mixture will have to be broken up, sealed in steel containers and moved to a nuclear waste storage site. That work will not start until some time after 2020. 必須 2000文字以内 [bbs:youtube:(Youtubeの動画ID)]と書くとYoutubeの動画が貼れます。(例:[bbs:youtube:OQThUAQ0UN0])